Contruction Log The Plane About Us

Fuselage Control System Pulleys Installation
Date: Thursday, October 29,2009
Assembly: Fuselage
Sub-Assembly: General
Work Time: 2 hours
Description: (still working on)
Prepared the forward pulley group for installation and made guards.
Installed the following pulleys: Lower Aft Aileron, Center Flap, Lower Outboard Flap, Upper Crossover.
*No cotter pins have been installed yet*

click a photo for the full resolution image
Guards in production.

The perfect Aimee-Task! (Although I did have some help cleaning out the painted attach points)

We seem to be missing castle nuts for the lower aft aileron pulleys... I doubt the dog ate them though.