Contruction Log The Plane About Us

Drill & Bolt the Main Gear Legs
Date: Saturday, January 30,2010
Assembly: Fuselage
Sub-Assembly: General
Work Time: 4 hours
Description: Check final bolt placement before drilling and recheck alignment.
Drill main gear legs using the step method.
Clean and deburr.

click a photo for the full resolution image
Note our fancy oil-drip'n'metal-chip catching system underneath! Be extra careful when you do this part, there's lot of flying (smoking) metal bits.

One down! The funny part about all this drilling is that our uber-cheap Harbor Freight bits are lasting longer than the extra-fancy Dewalt ones!