Contruction Log The Plane About Us

View the Last 10, 25, 50 entries or
select a sub-assembly to get the list of entries associated with it.


Assembly Sub-Assembly Total Time (To Date)

Empennage

Elevator 72.59

Empennage

Horizontal Stabilizer 53.00

Empennage

Rudder 41.55

Fuselage

General 28.03

Wings

Ailerons 65.79

Wings

Flaps 53.80

Wings

General 44.95
Total Time: 359.71